Bradford Bond Head Planning Area
Some of the following resources (PDF files) require the Adobe Acrobat Reader; click here to download it if you are without this software.
If you are having difficulty downloading any of these files, please contact the Town of Bradford West Gwillimbury. The Town will have a CD forwarded to you.Town of Bradford West Gwillimbury,
P.O. Box 160,
3541 Line 1,
Bradford, ON
L3Z 2A8,
attention Ms. Lorraine Wauchaupe,
or by email: lwauchope@townofbwg.com
Technical submissions in support of applications for amendments to the county of Simcoe and Bradford West Gwillimbury official plans.
- Servicing Study Volume 2 (Including Appendices) Stantec Consulting. September 2005
- Executive Summary
- Appendix A - Public Consultation
- Appendix B - Stream Water Quality Report August 2005
- Appendix C - Total Phosphorus Management
- Appendix D - Wastewater Servicing Report
- Appendix E - Water Servicing Report
- Land Use Proposal and Planning Assessment. Sorensen Gravely Lowes Planning Associates Inc. and Bousfields Inc. April 2004.
- Residential and Employment Needs Analysis. Clayton Research Associates. March 2004.
- Agricultural Impact Assessment. Stantec Consulting. March 2004.
- Environmental Constraints and Opportunities Study. Gartner Lee Limited. March 2004.
- Stage 1 Archaeological Assessment of the Bradford Bond Head Amendment Area. Archaeological Services Inc. March 2004.
- Commercial Needs Analysis. urbanMetrics Inc. March 2004.
- Servicing Study, Volume 1 (including Appendices). Stantec Consulting. March 2004.
- A Discussion Paper — Phosphorus, Lake Simcoe and New Urban Development. Michalski Nielsen Associates Limited. March 2004.
- Transportation Study, Volume 1. BA Consulting Group Ltd. March 2004.
- Fiscal Impact Study. Clayton Research Associates. March 2004.
- Rumm, Earl. Letter. Toronto Star 15 April 2004. 22 April 2004.
Bradford Bond Head Planning Area Ammendment Open House - April 22/04
- Land Use Planning
- Planning Area Components
- Landuse Concept Key Features
- Proposed Land Uses Amendment Area
- Structural Diagram
- Overall Land Use
- Stage One Development
- Physical Conditions
- Aerial Photo with Planning Area
- Regional Planning Considerations
- Regional Context Map, Fig. 2
- Established Urban Settlement Regional Context
- Regional Soils Map
- Regional Transportation Infrastructure
- Integrated Process
- Residential and Employment Land Needs
- Commercial Needs
- Process
- Archaeology
- Agriculture
- Natural Environment
- Servicing - Water, Wastewater, SWM
- Fig 1.0 Planning Area
- Fig 1.1 Proposed Staging Boundaries
- Fig 2.0 Integrated Process
- Fig 3.0 Current Water Supply Infrastructure
- Fig 3.1 Proposed Water Infrastructure External
- Fig 3.2 Stage I Water Infrastructure
- Fig 3.3 Pressure Zones
- Fig 3.4 Stage II Water Infrastructure
- Fig 5.0 WPCP Expansion Ph I Schematic
- Fig 5.2 Stage I Trunk Sewerage Scheme
- Fig 5.3 Stage II Trunk Sewerage Scheme
- Fig 5.5 WPCP Site Plan & Boundaries
- Fig 5.6 WPCP Site Plan
- Fig 6.1 Existing Drainage
- Fig 6.2 Draingage Boundaries
- Fig 6.3 Watercourses & Floodplain Delineation
- Fig 6.4 Prelim. SWM Locations.
- Transportation
- Phosphorous Presentation
- Regional Context Overview








